FEE SUMMARY
Residential
Deposit is based on credit check with Social Security Number – $100 – $300
Deposit without Social Security Number – $500
Connection Fee – $10.00
Membership – $5.00
Credit Check Fee $2.90
Commercial or Industrial
Deposits – Contact MDEC for Deposit Information
Three Phase Service – Contact Engineering Department
Three Phase Service – Contact Engineering Department
Reconnect Fee – $25.00
Transfer Fee – $10.00
Temporary Service Fee – $40.00 + Connection Fee $10.00
200 Amp Overhead Meter Socket for Mobile Home – $40.00
200 Amp Underground Meter Socket for Mobile Home -$45.00
Meter Test – $25.00
After Hours Fee – $100.00
Transfer Fee – $10.00
Temporary Service Fee – $40.00 + Connection Fee $10.00
200 Amp Overhead Meter Socket for Mobile Home – $40.00
200 Amp Underground Meter Socket for Mobile Home -$45.00
Meter Test – $25.00
After Hours Fee – $100.00
Construction Fee: Site-Built Home for Primary Residence Only
Deposit + Membership
When over two (2) poles are required for extending the line to the new site-built residence.
$350.00 for each additional pole
When over two (2) poles are required for extending the line to the new site-built residence.
$350.00 for each additional pole
Mobile Home Charges
Deposit + Membership
Service Pole – (Secondary Voltage) – $75.00
First Primary Pole – $175.00
Second Primary Pole – $200.00
All Additional Poles – $500.00
Service Pole – (Secondary Voltage) – $75.00
First Primary Pole – $175.00
Second Primary Pole – $200.00
All Additional Poles – $500.00
Barns & Shop Charges
Deposit + Membership
Service Pole – (Secondary Voltage) – $75.00
First Primary Pole – $175.00
Secondary Primary Pole – $200.00
All Additional Poles – $500.00
First Primary Pole – $175.00
Secondary Primary Pole – $200.00
All Additional Poles – $500.00
Outside Lights
Contact MDEC for Monthly Minimum Charge
50 Watt LED Area Light on Existing Pole – Installation Charge – $50.00
130 Watt LED Flood Light on Existing Pole – Installation Charge – $250.00
130 Watt LED Flood Light on Existing Pole – Installation Charge – $250.00
200 Amp Underground Service
(Maximum Distance for All Underground Service – 200ft)
Single Phase – Secondary Voltage up to 200ft – $200.00
Single Phase – Secondary Voltage up to 200ft – $200.00
400 Amp Underground Service
Single Phase – Secondary Voltage up to 200ft – $400.00
Single Phase CT Meter Installation – $1,000.00
Revised- 5-15-23
600 Amp Underground Service
Single Phase – Secondary Voltage up to 200ft – $600.00
Tampering/Electrical Theft
ALL ELECTRICAL THEFT IS SUBJECT TO PROSECUTION
1st Offense – $175.00
2nd Offense – $300.00
3rd Offense – $500.00